Project Details
- Client / Employer
- ADEK / Musanada
- Consultant
- El Sweidi / Musanada
- Main Contractor
- Al Eslah General Contracting
- Our Role
- MEP Contractor
- Status
- Completed 2020 (Phase 8, Package 1)
Supply, engineering, installation, testing and commissioning, handover and maintenance of the complete internal and external MEP works.
- HVAC works
- Plumbing works
- Electrical works
- Fire fighting system
- ELV works
More Projects
Azha Downtown Residences
Client: Azha Downtown Residences View Project Details
Azha Downtown Residences
- Client
- Azha Downtown Residences
- Employer
- Adnan Saffaroi Office LLC
- Main Contractor
- Hashim Contracting & Gen. Maintenance LLC
- Value of Contract
- AED 17,824,451
- Status
- Ongoing
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Parking + 14 Typical + 1 Technical Floor + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Al Forsan International Sports Resort
Client: Private Property Management View Project Details
Al Forsan International Sports Resort
- Client
- Private Property Management
- PMC
- IMCC
- Main Contractor
- Fibrex
- Our Role
- ELV Contractor
- Category
- Electrical
- Status
- Completed 2016
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of electrical and ELV systems at Khalifa City.
- Supply & install transformer
- Supply & install QRM
- Complete LV substation
- Lighting control system
- Network infrastructure, passive & active
- CCTV, access control, bollards & barriers
- Hybrid PABX, intercom & wireless radio
- Public address system
- Master clock, almost 150 digital clocks
- IPTV system
- Audio visual system
- Traffic control system
- Race control system
Al Watan School — Civil & MEP Works
Client: ADEK View Project Details
Al Watan School — Civil & MEP Works
- Client
- ADEK
- Employer
- Musanada
- Main Contractor
- Rejoiz, Abu Dhabi
- Category
- Civil & MEP
- Status
- Ongoing
Remaining civil and MEP works as main contractor, including closing of all defects notification reports.
- Remaining civil works
- Remaining MEP works
- Closing defects notification reports
- Civil & MEP spare parts supply
- Complete closeout documentation
Have a package to price? Send us the drawings.
Call our estimating team+971 55 114 1999
Request a Quotation