Shah Gas Development — Package 10
Client: ADGAS Development Company Ltd. View Project Details
Shah Gas Development — Package 10
- Client
- ADGAS Development Company Ltd.
- Main Contractor
- Al Jaber Energy Services LLC
- Our Role
- MEP Contractor
- Category
- MEP — EPC
- Status
- Completed 2017
Design modifications, engineering, installation and commissioning, handover and maintenance of the following MEP works.
- HVAC works
- Electrical works
- Plumbing works
- Fire fighting system
- Fire alarm system
- Inergen system
- Earthing & lightning protection
- UPS & central battery
- Security & access control
Al Forsan Hotel (Five Star), Abu Dhabi
Client: ADISC View Project Details
Al Forsan Hotel (Five Star), Abu Dhabi
- Client
- ADISC
- Consultant
- ATKINS
- Main Contractor
- Fibrex
- Our Role
- Nominated Contractor
- Category
- ELV & ICTS Systems
- Status
- Completed January 2018
Design, engineering, supply, installation, integration, testing and commissioning, handover and maintenance of complete ICT, ELV and AV systems.
- Data & voice infrastructure
- Wireless network
- Closed circuit television
- Guest room management system
- Door access control
- Gate barriers & sliding gates
- Public address system
- IP telephone system
- Master clock system
- Intercom system
- IPTV system
- Audio visual system
FERTIL-2 Non-Process Buildings
Client: Ruwais Fertilizer Industry (FERTIL) View Project Details
FERTIL-2 Non-Process Buildings
- Client
- Ruwais Fertilizer Industry (FERTIL)
- Main Contractor
- Amana Contracting
- Our Role
- MEP Contractor
- Category
- MEP — EPC
- Status
- Completed 2015
Design, engineering, supply, installation and commissioning, handover and maintenance of the following MEP works.
- HVAC works
- Plumbing works
- Electrical works
- Light dimming & switching
- Fire fighting & sprinkler system
- Fire alarm & suppression
- Lightning system
- UPS & central battery
- Data & voice infrastructure
- Sanitary & drainage
- Water supply & storm water
- Security systems
- SMATV, video intercom & conferencing
Abu Dhabi Future School — Phase 5, Pac 1
Client: ADEK View Project Details
Abu Dhabi Future School — Phase 5, Pac 1
- Client
- ADEK
- Employer
- Musanada
- Main Contractor
- Al Mansouri 3B
- Our Role
- MEP Contractor
- Status
- Completed 2018
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of MEP works.
- HVAC works
- Electrical works
- Plumbing works
- Fire fighting system
- Fire alarm system
- UPS & central battery
- Structured cabling
- CCTV system
- Access control system
- Disabled toilet alarm
- AV systems
Mafraq Workers Camp — 44 Buildings
Client: Zonecorp View Project Details
Mafraq Workers Camp — 44 Buildings
- Client
- Zonecorp
- Main Contractor
- Al Jaber
- Our Role
- MEP Subcontractor
- Status
- Completed 2014
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of complete MEP works for 44 buildings (G+2) as per UAE regulations.
- HVAC works
- Power works, transformer to MDB
- Lighting & power, MDB to sockets
- Distribution circuit breaker boards
- Laying & installation of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
Akoya Oxygen Villas — 210 Villas
Client: DAMAC View Project Details
Akoya Oxygen Villas — 210 Villas
- Client
- DAMAC
- Consultant
- KEO Consultants
- Main Contractor
- Ghantoot General Contracting
- Our Role
- MEP Contractor
- Status
- Completed 2019
Supply, engineering, installation, testing and commissioning, handover and maintenance of the complete internal and external MEP works across 210 villas.
- HVAC works
- Plumbing works
- Electrical works
- Fire fighting system
Al Forsan International Sports Resort
Client: Private Property Management View Project Details
Al Forsan International Sports Resort
- Client
- Private Property Management
- PMC
- IMCC
- Main Contractor
- Fibrex
- Our Role
- ELV Contractor
- Category
- Electrical
- Status
- Completed 2016
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of electrical and ELV systems at Khalifa City.
- Supply & install transformer
- Supply & install QRM
- Complete LV substation
- Lighting control system
- Network infrastructure, passive & active
- CCTV, access control, bollards & barriers
- Hybrid PABX, intercom & wireless radio
- Public address system
- Master clock, almost 150 digital clocks
- IPTV system
- Audio visual system
- Traffic control system
- Race control system
ENEC Guest House & Visitor Centre
Client: Emirates Nuclear Energy Corporation View Project Details
ENEC Guest House & Visitor Centre
- Client
- Emirates Nuclear Energy Corporation
- Consultant
- Tangram Engineering Consultants
- Main Contractor
- Al Jaber Buildings LLC
- Our Role
- Subcontractor
- Category
- Electrical
- Status
- Completed 2016
Design, engineering, supply, installation and commissioning, handover and maintenance of the following electromechanical systems, complete.
- Lighting & power complete
- RMU & transformer
- Light control system
- Earthing & lightning protection
- Fire fighting, hydrant, hose reel & sprinkler
- Fire alarm system
- Fire suppression system
- UPS system
- Central battery system
- Diesel generator
- Data & voice infrastructure incl. WiFi
- CCTV & access control
- Audio visual & video conferencing
- Public address & voice evacuation
- IPTV system
- IP telephony system
- Building management system
Shah Gas Plant — Package 9, Pioneer Camp
Client: ADGAS Development Company Ltd. View Project Details
Shah Gas Plant — Package 9, Pioneer Camp
- Client
- ADGAS Development Company Ltd.
- Main Contractor
- Al Jaber Energy Service LLC
- Our Role
- MEP Subcontractor
- Category
- MEP — EPC
- Status
- Completed 2015
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of MEP works at the Pioneer Camp and Centralized Camp.
- HVAC works
- Plumbing works
- Electrical works
- Light dimming & switching
- Fire fighting system
- Fire alarm system
- Fire suppression system
- Earthing & lightning protection
- Central battery system
- Data & voice infrastructure
- Security systems
- SMATV, video intercom & conferencing
Abu Dhabi Future School — Al Falah
Client: ADEK / Musanada View Project Details
Abu Dhabi Future School — Al Falah
- Client / Employer
- ADEK / Musanada
- Consultant
- El Sweidi / Musanada
- Main Contractor
- Al Eslah General Contracting
- Our Role
- MEP Contractor
- Status
- Completed 2020 (Phase 8, Package 1)
Supply, engineering, installation, testing and commissioning, handover and maintenance of the complete internal and external MEP works.
- HVAC works
- Plumbing works
- Electrical works
- Fire fighting system
- ELV works
Al Abbas School Extension, Al Ruwais
Client: ADNOC View Project Details
Al Abbas School Extension, Al Ruwais
- Client
- ADNOC
- Main Contractor
- Force 10
- Our Role
- MEP Contractor
- Status
- Completed 2018
Supply, engineering, installation, testing and commissioning, handover and maintenance of the complete internal and external MEP works.
- HVAC works
- Plumbing works
- Electrical works
- Fire fighting system
- CCTV & access control
Yas Family Hotel — Building Management System
Client: Miral View Project Details
Yas Family Hotel — Building Management System
- Client
- Miral
- Main Contractor
- Sanjose Fibrex JV
- Our Role
- MEP Contractor — BMS
- Category
- Building Management System
- Status
- Ongoing
Supply, engineering, installation, testing and commissioning, handover and maintenance through the defects liability period of the Building Management System.
- BMS supply & installation
- Testing & commissioning
- Handover documentation
- DLP maintenance
Al Watan School — Civil & MEP Works
Client: ADEK View Project Details
Al Watan School — Civil & MEP Works
- Client
- ADEK
- Employer
- Musanada
- Main Contractor
- Rejoiz, Abu Dhabi
- Category
- Civil & MEP
- Status
- Ongoing
Remaining civil and MEP works as main contractor, including closing of all defects notification reports.
- Remaining civil works
- Remaining MEP works
- Closing defects notification reports
- Civil & MEP spare parts supply
- Complete closeout documentation
Azha Downtown Residences
Client: Azha Downtown Residences View Project Details
Azha Downtown Residences
- Client
- Azha Downtown Residences
- Employer
- Adnan Saffaroi Office LLC
- Main Contractor
- Hashim Contracting & Gen. Maintenance LLC
- Value of Contract
- AED 17,824,451
- Status
- Ongoing
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Parking + 14 Typical + 1 Technical Floor + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Al Barrari 3 Luxurious Villas
Client: Kamal Shihada View Project Details
Al Barrari 3 Luxurious Villas
- Client
- Kamal Shihada
- Employer
- Atrium Engineering Consultant
- Main Contractor
- Future Contracting Co
- Value of Contract
- AED 4,500,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+2 + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Crystal Four Building
Client: Crystal Four LLC View Project Details
Crystal Four Building
- Client
- Crystal Four LLC
- Employer
- NEB
- Main Contractor
- Arab Contractors
- Value of Contract
- AED 6,500,000
- Status
- Ongoing
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (B+G+5 Typical + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Elegance Tower
Client: Al Chaimaa Holding Limited View Project Details
Elegance Tower
- Client
- Al Chaimaa Holding Limited
- Employer
- Datum Engineering Consultant
- Main Contractor
- High Star Contracting Co
- Value of Contract
- AED 12,970,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Parking + 14 Typical + 1 Technical Floor + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Essa Salem Residential Building
Client: Essa Salem View Project DetailsEssa Salem Residential Building
- Client
- Essa Salem
- Employer
- Safees Engineering Consultant
- Main Contractor
- Future Contracting Co
- Value of Contract
- AED 6,200,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Typical + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system