Project Details
- Client
- Al Chaimaa Holding Limited
- Employer
- Datum Engineering Consultant
- Main Contractor
- High Star Contracting Co
- Value of Contract
- AED 12,970,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Parking + 14 Typical + 1 Technical Floor + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
More Projects
Al Forsan International Sports Resort
Client: Private Property Management View Project Details
Al Forsan International Sports Resort
- Client
- Private Property Management
- PMC
- IMCC
- Main Contractor
- Fibrex
- Our Role
- ELV Contractor
- Category
- Electrical
- Status
- Completed 2016
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of electrical and ELV systems at Khalifa City.
- Supply & install transformer
- Supply & install QRM
- Complete LV substation
- Lighting control system
- Network infrastructure, passive & active
- CCTV, access control, bollards & barriers
- Hybrid PABX, intercom & wireless radio
- Public address system
- Master clock, almost 150 digital clocks
- IPTV system
- Audio visual system
- Traffic control system
- Race control system
Abu Dhabi Future School — Al Falah
Client: ADEK / Musanada View Project Details
Abu Dhabi Future School — Al Falah
- Client / Employer
- ADEK / Musanada
- Consultant
- El Sweidi / Musanada
- Main Contractor
- Al Eslah General Contracting
- Our Role
- MEP Contractor
- Status
- Completed 2020 (Phase 8, Package 1)
Supply, engineering, installation, testing and commissioning, handover and maintenance of the complete internal and external MEP works.
- HVAC works
- Plumbing works
- Electrical works
- Fire fighting system
- ELV works
Shah Gas Development — Package 10
Client: ADGAS Development Company Ltd. View Project Details
Shah Gas Development — Package 10
- Client
- ADGAS Development Company Ltd.
- Main Contractor
- Al Jaber Energy Services LLC
- Our Role
- MEP Contractor
- Category
- MEP — EPC
- Status
- Completed 2017
Design modifications, engineering, installation and commissioning, handover and maintenance of the following MEP works.
- HVAC works
- Electrical works
- Plumbing works
- Fire fighting system
- Fire alarm system
- Inergen system
- Earthing & lightning protection
- UPS & central battery
- Security & access control
Have a package to price? Send us the drawings.