Project Details
- Client
- ADGAS Development Company Ltd.
- Main Contractor
- Al Jaber Energy Services LLC
- Our Role
- MEP Contractor
- Category
- MEP — EPC
- Status
- Completed 2017
Design modifications, engineering, installation and commissioning, handover and maintenance of the following MEP works.
- HVAC works
- Electrical works
- Plumbing works
- Fire fighting system
- Fire alarm system
- Inergen system
- Earthing & lightning protection
- UPS & central battery
- Security & access control
More Projects
Al Barrari 3 Luxurious Villas
Client: Kamal Shihada View Project Details
Al Barrari 3 Luxurious Villas
- Client
- Kamal Shihada
- Employer
- Atrium Engineering Consultant
- Main Contractor
- Future Contracting Co
- Value of Contract
- AED 4,500,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+2 + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Azha Downtown Residences
Client: Azha Downtown Residences View Project Details
Azha Downtown Residences
- Client
- Azha Downtown Residences
- Employer
- Adnan Saffaroi Office LLC
- Main Contractor
- Hashim Contracting & Gen. Maintenance LLC
- Value of Contract
- AED 17,824,451
- Status
- Ongoing
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Parking + 14 Typical + 1 Technical Floor + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Abu Dhabi Future School — Al Falah
Client: ADEK / Musanada View Project Details
Abu Dhabi Future School — Al Falah
- Client / Employer
- ADEK / Musanada
- Consultant
- El Sweidi / Musanada
- Main Contractor
- Al Eslah General Contracting
- Our Role
- MEP Contractor
- Status
- Completed 2020 (Phase 8, Package 1)
Supply, engineering, installation, testing and commissioning, handover and maintenance of the complete internal and external MEP works.
- HVAC works
- Plumbing works
- Electrical works
- Fire fighting system
- ELV works
Have a package to price? Send us the drawings.
Call our estimating team+971 55 114 1999
Request a Quotation