Project Details
- Client
- Emirates Nuclear Energy Corporation
- Consultant
- Tangram Engineering Consultants
- Main Contractor
- Al Jaber Buildings LLC
- Our Role
- Subcontractor
- Category
- Electrical
- Status
- Completed 2016
Design, engineering, supply, installation and commissioning, handover and maintenance of the following electromechanical systems, complete.
- Lighting & power complete
- RMU & transformer
- Light control system
- Earthing & lightning protection
- Fire fighting, hydrant, hose reel & sprinkler
- Fire alarm system
- Fire suppression system
- UPS system
- Central battery system
- Diesel generator
- Data & voice infrastructure incl. WiFi
- CCTV & access control
- Audio visual & video conferencing
- Public address & voice evacuation
- IPTV system
- IP telephony system
- Building management system
More Projects
Al Barrari 3 Luxurious Villas
Client: Kamal Shihada View Project Details
Al Barrari 3 Luxurious Villas
- Client
- Kamal Shihada
- Employer
- Atrium Engineering Consultant
- Main Contractor
- Future Contracting Co
- Value of Contract
- AED 4,500,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+2 + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Elegance Tower
Client: Al Chaimaa Holding Limited View Project Details
Elegance Tower
- Client
- Al Chaimaa Holding Limited
- Employer
- Datum Engineering Consultant
- Main Contractor
- High Star Contracting Co
- Value of Contract
- AED 12,970,000
- Status
- Completed
- Category
- Full MEP
Design, engineering, supply, installation, testing & commissioning, handover and maintenance of complete MEP works for residential buildings (G+4 Parking + 14 Typical + 1 Technical Floor + Roof) as per UAE regulations, complete.
- HVAC works
- Power works, transformer to power MDB
- Lighting and power works, MDB to power sockets
- Supply and installation of distribution circuit breaker boards
- Laying and installation of different types of cables
- Sanitary & drainage system
- Water supply system
- ELV systems
- Fire fighting & fire alarm system
Abu Dhabi Future School — Phase 5, Pac 1
Client: ADEK View Project Details
Abu Dhabi Future School — Phase 5, Pac 1
- Client
- ADEK
- Employer
- Musanada
- Main Contractor
- Al Mansouri 3B
- Our Role
- MEP Contractor
- Status
- Completed 2018
Design, engineering, supply, installation, testing and commissioning, handover and maintenance of MEP works.
- HVAC works
- Electrical works
- Plumbing works
- Fire fighting system
- Fire alarm system
- UPS & central battery
- Structured cabling
- CCTV system
- Access control system
- Disabled toilet alarm
- AV systems
Have a package to price? Send us the drawings.
Call our estimating team+971 55 114 1999